Cargando…
Performance validation of the existing and upgraded PS injection kicker
The CERN PS injection kicker KFA45 will be upgraded in the framework of the LHC Injector Upgrade (LIU) project to allow for injection of 2 GeV proton beams. This paper summarizes the recent efforts to validate beam based waveform measurements, Pspice simulations and current waveform measurements by...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-THPRB078 http://cds.cern.ch/record/2692797 |