Cargando…
LHC Status and Outlook to the HL-LHC
The CERN Large Hadron Collider (LHC) is in its final year of Run 2. The 2-year long shutdown (LS2) will start in 2019 during which the LHC injector Upgrade (LIU) project will be deployed, the first step towards the High Luminosity LHC (HL-LHC) that will be fully deployed during the long shutdown 3 (...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1142/9789811200380_0014 http://cds.cern.ch/record/2759811 |