Cargando…

The Phase-2 ATLAS ITk pixel upgrade

The new ATLAS ITk pixel system will be installed during the LHC Phase-2 shutdown, to better take advantage of the increased luminosity of the HL-LHC. The detector will consists of five layers of stave-like support structures in the most central region and ring-shaped supports in the endcap regions,...

Descripción completa

Detalles Bibliográficos
Autor principal: Macchiolo, A
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2019.06.002
http://cds.cern.ch/record/2713713