Cargando…

Electronics System of the CMS GE1/1 Muon Upgrade and Lessons Learned From the Slice Test During the 2017-2018 LHC Runs

In this contribution, we will present the status of the readout electronics system for the triple-GEM detectors of the GE1/1 system, an upgrade which is being installed into the CMS experiment during the present LHC long shutdown (LS2) in 2019-2020. We will also report on the lessons learned from th...

Descripción completa

Detalles Bibliográficos
Autor principal: Starling, Elizabeth Rose
Lenguaje:eng
Publicado: SISSA 2020
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.370.0118
http://cds.cern.ch/record/2727831