Cargando…
Electronics System of the CMS GE1/1 Muon Upgrade and Lessons Learned From the Slice Test During the 2017-2018 LHC Runs
In this contribution, we will present the status of the readout electronics system for the triple-GEM detectors of the GE1/1 system, an upgrade which is being installed into the CMS experiment during the present LHC long shutdown (LS2) in 2019-2020. We will also report on the lessons learned from th...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.370.0118 http://cds.cern.ch/record/2727831 |