Cargando…
Beam induced dynamic pressure during Run 2 (2015-2018)
The LHC successfully returned to operation in April 2015after almost 2 years of Long Shutdown 1 (LS1) for variousupgrade and consolidation programs. During Run 2 (2015 -2018) the LHC operated for more than 3600 fills and it hasreached a total integrated luminosity of more than 150 fb1.This paper sum...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23732/CYRCP-2020-007.65 http://cds.cern.ch/record/2736207 |