Cargando…

Beam induced dynamic pressure during Run 2 (2015-2018)

The LHC successfully returned to operation in April 2015after almost 2 years of Long Shutdown 1 (LS1) for variousupgrade and consolidation programs. During Run 2 (2015 -2018) the LHC operated for more than 3600 fills and it hasreached a total integrated luminosity of more than 150 fb1.This paper sum...

Descripción completa

Detalles Bibliográficos
Autores principales: Yin Vallgren, C, Ribes Metidieri, P, Bregliozzi, G
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.23732/CYRCP-2020-007.65
http://cds.cern.ch/record/2736207