Cargando…
Status of the Process Control Systems Upgrade for the Cryogenic Installations of the LHC Based ATLAS and CMS Detectors
The ATLAS and CMS cryogenic control systems have been operational for more than a decade. Over this period, the number of PLCs faults increased due to equipment ageing, leading to systems failures. Maintenance of the systems started to be problematic due to the unavailability of some PLC hardware co...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA050 http://cds.cern.ch/record/2771266 |