Cargando…
The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2
The IRRAD proton irradiation facility at CERN was built during the Long Shutdown 1 (LS1) to address the irradiation experiment needs of the community working for the High-Luminosity (HL) upgrade of the LHC. The present IRRAD is an upgrade of a historical service at CERN that, since the 90’s, exploit...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA127 http://cds.cern.ch/record/2766868 |