Cargando…
The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2
The IRRAD proton irradiation facility at CERN was built during the Long Shutdown 1 (LS1) to address the irradiation experiment needs of the community working for the High-Luminosity (HL) upgrade of the LHC. The present IRRAD is an upgrade of a historical service at CERN that, since the 90’s, exploit...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA127 http://cds.cern.ch/record/2766868 |
_version_ | 1780971293024190464 |
---|---|
author | Ravotti, Federico Gkotse, Blerina Glaser, Maurice Jouvelot, Pierre Mateu, Isidre Meskova, Viktoria Pezzullo, Giuseppe Sallese, Jean-Michel |
author_facet | Ravotti, Federico Gkotse, Blerina Glaser, Maurice Jouvelot, Pierre Mateu, Isidre Meskova, Viktoria Pezzullo, Giuseppe Sallese, Jean-Michel |
author_sort | Ravotti, Federico |
collection | CERN |
description | The IRRAD proton irradiation facility at CERN was built during the Long Shutdown 1 (LS1) to address the irradiation experiment needs of the community working for the High-Luminosity (HL) upgrade of the LHC. The present IRRAD is an upgrade of a historical service at CERN that, since the 90’s, exploits the high-intensity 24 GeV/c PS proton beam for radiation-hardness studies of detector, accelerator and semiconductor components and materials. During its first run (2015-2018), IRRAD provided a key service to the CERN community, with more than 2500 samples irradiated. IRRAD is operated via custom-made irradiation systems, beam diagnostics and data management tools. During the Long Shutdown 2 (LS2), IRRAD will undergo several upgrades in order to cope also with new requirements arising for projects beyond the HL-LHC. In this paper, we (1) describe the various hardware and software equipment developed for IRRAD, and (2) present the main challenges encountered during the first years of operation, which have driven most of the improvements planned for LS2 such as applying machine-learning techniques in the processing and real-time analysis of beam profile data. |
id | oai-inspirehep.net-1828359 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-18283592022-11-17T15:10:18Zdoi:10.18429/JACoW-ICALEPCS2019-WEPHA127http://cds.cern.ch/record/2766868engRavotti, FedericoGkotse, BlerinaGlaser, MauriceJouvelot, PierreMateu, IsidreMeskova, ViktoriaPezzullo, GiuseppeSallese, Jean-MichelThe IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2Accelerators and Storage RingsThe IRRAD proton irradiation facility at CERN was built during the Long Shutdown 1 (LS1) to address the irradiation experiment needs of the community working for the High-Luminosity (HL) upgrade of the LHC. The present IRRAD is an upgrade of a historical service at CERN that, since the 90’s, exploits the high-intensity 24 GeV/c PS proton beam for radiation-hardness studies of detector, accelerator and semiconductor components and materials. During its first run (2015-2018), IRRAD provided a key service to the CERN community, with more than 2500 samples irradiated. IRRAD is operated via custom-made irradiation systems, beam diagnostics and data management tools. During the Long Shutdown 2 (LS2), IRRAD will undergo several upgrades in order to cope also with new requirements arising for projects beyond the HL-LHC. In this paper, we (1) describe the various hardware and software equipment developed for IRRAD, and (2) present the main challenges encountered during the first years of operation, which have driven most of the improvements planned for LS2 such as applying machine-learning techniques in the processing and real-time analysis of beam profile data.oai:inspirehep.net:18283592019 |
spellingShingle | Accelerators and Storage Rings Ravotti, Federico Gkotse, Blerina Glaser, Maurice Jouvelot, Pierre Mateu, Isidre Meskova, Viktoria Pezzullo, Giuseppe Sallese, Jean-Michel The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2 |
title | The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2 |
title_full | The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2 |
title_fullStr | The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2 |
title_full_unstemmed | The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2 |
title_short | The IRRAD Proton Irradiation Facility Control, Data Management and Beam Diagnostic Systems: An Outlook of the Major Upgrades Beyond the CERN Long Shutdown 2 |
title_sort | irrad proton irradiation facility control, data management and beam diagnostic systems: an outlook of the major upgrades beyond the cern long shutdown 2 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA127 http://cds.cern.ch/record/2766868 |
work_keys_str_mv | AT ravottifederico theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT gkotseblerina theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT glasermaurice theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT jouvelotpierre theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT mateuisidre theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT meskovaviktoria theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT pezzullogiuseppe theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT sallesejeanmichel theirradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT ravottifederico irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT gkotseblerina irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT glasermaurice irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT jouvelotpierre irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT mateuisidre irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT meskovaviktoria irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT pezzullogiuseppe irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 AT sallesejeanmichel irradprotonirradiationfacilitycontroldatamanagementandbeamdiagnosticsystemsanoutlookofthemajorupgradesbeyondthecernlongshutdown2 |