Cargando…
Chapter 1: High-Luminosity Large Hadron Collider
The Large Hadron Collider (LHC) was successfully commissioned in 2010 for proton–proton collisions with a 7 TeV centre-of-mass (c.o.m.) energy. It delivered 8 TeV c.o.m. proton collisions from April 2012 until the end of Run 1 in 2013. Following the Long Shutdown 1 (LS1) in 2013–2014, it operated wi...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.1 http://cds.cern.ch/record/2750437 |