Cargando…
Chapter 1: High-Luminosity Large Hadron Collider
The Large Hadron Collider (LHC) was successfully commissioned in 2010 for proton–proton collisions with a 7 TeV centre-of-mass (c.o.m.) energy. It delivered 8 TeV c.o.m. proton collisions from April 2012 until the end of Run 1 in 2013. Following the Long Shutdown 1 (LS1) in 2013–2014, it operated wi...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.1 http://cds.cern.ch/record/2750437 |
_version_ | 1780969133620330496 |
---|---|
author | Brüning, O Rossi, L |
author_facet | Brüning, O Rossi, L |
author_sort | Brüning, O |
collection | CERN |
description | The Large Hadron Collider (LHC) was successfully commissioned in 2010 for proton–proton collisions with a 7 TeV centre-of-mass (c.o.m.) energy. It delivered 8 TeV c.o.m. proton collisions from April 2012 until the end of Run 1 in 2013. Following the Long Shutdown 1 (LS1) in 2013–2014, it operated with 13 TeV c.o.m. proton collisions during Run 2 from 2015 until the end of 2018, reaching a peak luminosity twice the nominal design value. At present (2020), the LHC is in Long Shutdown 2 (LS2) during which further consolidation measures (insulation and retrofitting of the protection diode connections) are being pursued; these should enable the LHC to reach its nominal design beam energy of 7 TeV. As a consequence of the coronavirus pandemic, LS2 will last almost one year longer than foreseen, with Run 3 now planned to start at the beginning of 2022. |
id | oai-inspirehep.net-1842583 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2020 |
record_format | invenio |
spelling | oai-inspirehep.net-18425832023-02-03T13:23:26Zdoi:10.23731/CYRM-2020-0010.1http://cds.cern.ch/record/2750437engBrüning, ORossi, LChapter 1: High-Luminosity Large Hadron ColliderAccelerators and Storage RingsThe Large Hadron Collider (LHC) was successfully commissioned in 2010 for proton–proton collisions with a 7 TeV centre-of-mass (c.o.m.) energy. It delivered 8 TeV c.o.m. proton collisions from April 2012 until the end of Run 1 in 2013. Following the Long Shutdown 1 (LS1) in 2013–2014, it operated with 13 TeV c.o.m. proton collisions during Run 2 from 2015 until the end of 2018, reaching a peak luminosity twice the nominal design value. At present (2020), the LHC is in Long Shutdown 2 (LS2) during which further consolidation measures (insulation and retrofitting of the protection diode connections) are being pursued; these should enable the LHC to reach its nominal design beam energy of 7 TeV. As a consequence of the coronavirus pandemic, LS2 will last almost one year longer than foreseen, with Run 3 now planned to start at the beginning of 2022.oai:inspirehep.net:18425832020 |
spellingShingle | Accelerators and Storage Rings Brüning, O Rossi, L Chapter 1: High-Luminosity Large Hadron Collider |
title | Chapter 1: High-Luminosity Large Hadron Collider |
title_full | Chapter 1: High-Luminosity Large Hadron Collider |
title_fullStr | Chapter 1: High-Luminosity Large Hadron Collider |
title_full_unstemmed | Chapter 1: High-Luminosity Large Hadron Collider |
title_short | Chapter 1: High-Luminosity Large Hadron Collider |
title_sort | chapter 1: high-luminosity large hadron collider |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.23731/CYRM-2020-0010.1 http://cds.cern.ch/record/2750437 |
work_keys_str_mv | AT bruningo chapter1highluminositylargehadroncollider AT rossil chapter1highluminositylargehadroncollider |