Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole

The upgraded magnet assembly of the EDIPO test facility aims at generating 15 T at 4.2 K and 85% of short sample limit in a large rectangular aperture and over a uniform field length of 1000 mm. During 2020 the design studies have concentrated on two flared-end block-coil design options with four do...

Descripción completa

Detalles Bibliográficos
Autores principales: Araujo, Douglas Martins, Ballarino, Amalia, Bordini, Bernardo, Bottura, Luca, Hopkins, Simon C, Perez, Juan C, Ravaioli, Emmanuele, de Rijk, Gijs, Bruzzone, Pierluigi, Sarasola, Xabier, Sedlak, Kamil, Solodko, Evgeny, Cau, Francesca, Portone, Alfredo, Reccia, Luigi, Testoni, Pietro, Arbelaez, Diego, Ferracin, Paolo, Pong, Ian, Prestemon, Soren, Sabbi, GianLuca, Vallone, Giorgio