Cargando…
Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole
The upgraded magnet assembly of the EDIPO test facility aims at generating 15 T at 4.2 K and 85% of short sample limit in a large rectangular aperture and over a uniform field length of 1000 mm. During 2020 the design studies have concentrated on two flared-end block-coil design options with four do...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2021.3061044 http://cds.cern.ch/record/2765828 |
_version_ | 1780971185929977856 |
---|---|
author | Araujo, Douglas Martins Ballarino, Amalia Bordini, Bernardo Bottura, Luca Hopkins, Simon C Perez, Juan C Ravaioli, Emmanuele de Rijk, Gijs Bruzzone, Pierluigi Sarasola, Xabier Sedlak, Kamil Solodko, Evgeny Cau, Francesca Portone, Alfredo Reccia, Luigi Testoni, Pietro Arbelaez, Diego Ferracin, Paolo Pong, Ian Prestemon, Soren Sabbi, GianLuca Vallone, Giorgio |
author_facet | Araujo, Douglas Martins Ballarino, Amalia Bordini, Bernardo Bottura, Luca Hopkins, Simon C Perez, Juan C Ravaioli, Emmanuele de Rijk, Gijs Bruzzone, Pierluigi Sarasola, Xabier Sedlak, Kamil Solodko, Evgeny Cau, Francesca Portone, Alfredo Reccia, Luigi Testoni, Pietro Arbelaez, Diego Ferracin, Paolo Pong, Ian Prestemon, Soren Sabbi, GianLuca Vallone, Giorgio |
author_sort | Araujo, Douglas Martins |
collection | CERN |
description | The upgraded magnet assembly of the EDIPO test facility aims at generating 15 T at 4.2 K and 85% of short sample limit in a large rectangular aperture and over a uniform field length of 1000 mm. During 2020 the design studies have concentrated on two flared-end block-coil design options with four double-pancake coils, two per pole. The coils are planned to be produced using Nb3Sn Rutherford cable with 44 × 1.1 mm diameter strands, which results in significantly larger dimensions compared to the typical cables used in accelerator magnets. Two sections of dummy superconducting cable have been produced, and dedicated tooling was developed to study the wind-ability of such high aspect ratio cable and provide input to define the geometrical parameters of the coil flared ends. This paper describes two magnet designs proposed for EDIPO focusing on the magnetic and the mechanical design. |
id | oai-inspirehep.net-1860697 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | oai-inspirehep.net-18606972021-05-07T11:43:20Zdoi:10.1109/TASC.2021.3061044http://cds.cern.ch/record/2765828engAraujo, Douglas MartinsBallarino, AmaliaBordini, BernardoBottura, LucaHopkins, Simon CPerez, Juan CRavaioli, Emmanuelede Rijk, GijsBruzzone, PierluigiSarasola, XabierSedlak, KamilSolodko, EvgenyCau, FrancescaPortone, AlfredoReccia, LuigiTestoni, PietroArbelaez, DiegoFerracin, PaoloPong, IanPrestemon, SorenSabbi, GianLucaVallone, GiorgioProgress on the Upgrade of EDIPO, a 15 T Large Aperture DipoleThe upgraded magnet assembly of the EDIPO test facility aims at generating 15 T at 4.2 K and 85% of short sample limit in a large rectangular aperture and over a uniform field length of 1000 mm. During 2020 the design studies have concentrated on two flared-end block-coil design options with four double-pancake coils, two per pole. The coils are planned to be produced using Nb3Sn Rutherford cable with 44 × 1.1 mm diameter strands, which results in significantly larger dimensions compared to the typical cables used in accelerator magnets. Two sections of dummy superconducting cable have been produced, and dedicated tooling was developed to study the wind-ability of such high aspect ratio cable and provide input to define the geometrical parameters of the coil flared ends. This paper describes two magnet designs proposed for EDIPO focusing on the magnetic and the mechanical design.oai:inspirehep.net:18606972021 |
spellingShingle | Araujo, Douglas Martins Ballarino, Amalia Bordini, Bernardo Bottura, Luca Hopkins, Simon C Perez, Juan C Ravaioli, Emmanuele de Rijk, Gijs Bruzzone, Pierluigi Sarasola, Xabier Sedlak, Kamil Solodko, Evgeny Cau, Francesca Portone, Alfredo Reccia, Luigi Testoni, Pietro Arbelaez, Diego Ferracin, Paolo Pong, Ian Prestemon, Soren Sabbi, GianLuca Vallone, Giorgio Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole |
title | Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole |
title_full | Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole |
title_fullStr | Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole |
title_full_unstemmed | Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole |
title_short | Progress on the Upgrade of EDIPO, a 15 T Large Aperture Dipole |
title_sort | progress on the upgrade of edipo, a 15 t large aperture dipole |
url | https://dx.doi.org/10.1109/TASC.2021.3061044 http://cds.cern.ch/record/2765828 |
work_keys_str_mv | AT araujodouglasmartins progressontheupgradeofedipoa15tlargeaperturedipole AT ballarinoamalia progressontheupgradeofedipoa15tlargeaperturedipole AT bordinibernardo progressontheupgradeofedipoa15tlargeaperturedipole AT botturaluca progressontheupgradeofedipoa15tlargeaperturedipole AT hopkinssimonc progressontheupgradeofedipoa15tlargeaperturedipole AT perezjuanc progressontheupgradeofedipoa15tlargeaperturedipole AT ravaioliemmanuele progressontheupgradeofedipoa15tlargeaperturedipole AT derijkgijs progressontheupgradeofedipoa15tlargeaperturedipole AT bruzzonepierluigi progressontheupgradeofedipoa15tlargeaperturedipole AT sarasolaxabier progressontheupgradeofedipoa15tlargeaperturedipole AT sedlakkamil progressontheupgradeofedipoa15tlargeaperturedipole AT solodkoevgeny progressontheupgradeofedipoa15tlargeaperturedipole AT caufrancesca progressontheupgradeofedipoa15tlargeaperturedipole AT portonealfredo progressontheupgradeofedipoa15tlargeaperturedipole AT reccialuigi progressontheupgradeofedipoa15tlargeaperturedipole AT testonipietro progressontheupgradeofedipoa15tlargeaperturedipole AT arbelaezdiego progressontheupgradeofedipoa15tlargeaperturedipole AT ferracinpaolo progressontheupgradeofedipoa15tlargeaperturedipole AT pongian progressontheupgradeofedipoa15tlargeaperturedipole AT prestemonsoren progressontheupgradeofedipoa15tlargeaperturedipole AT sabbigianluca progressontheupgradeofedipoa15tlargeaperturedipole AT vallonegiorgio progressontheupgradeofedipoa15tlargeaperturedipole |