Cargando…
Prediction of cost and schedule performance in post-hurricane reconstruction of transportation infrastructure
This study aimed to develop predictive models that could be used to estimate the cost and schedule performance of reconstruction of transportation infrastructure damaged by hurricanes and to determine the predictors that are robustly connected to the developed models. Stepwise multiple linear regres...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10057790/ https://www.ncbi.nlm.nih.gov/pubmed/36989228 http://dx.doi.org/10.1371/journal.pone.0282231 |