Cargando…

Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration

In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhang, Huijian, Liu, Kai, Cao, Pan, Liu, Gongning
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10188613/
https://www.ncbi.nlm.nih.gov/pubmed/37193744
http://dx.doi.org/10.1038/s41598-023-35047-1