Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration

In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhang, Huijian, Liu, Kai, Cao, Pan, Liu, Gongning
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10188613/
https://www.ncbi.nlm.nih.gov/pubmed/37193744
http://dx.doi.org/10.1038/s41598-023-35047-1
_version_ 1785042951613710336
author Zhang, Huijian
Liu, Kai
Cao, Pan
Liu, Gongning
author_facet Zhang, Huijian
Liu, Kai
Cao, Pan
Liu, Gongning
author_sort Zhang, Huijian
collection PubMed
description In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this paper, the comprehensive research is conducted on the displacement risk caused by dismantling temporary lining based on two alternative tunneling methods (TM-1 and TM-2). Besides, the following three influence factors are taken into consideration: the axial forces in temporary linings, the thickness of preliminary linings, and the deformation modulus of ground. After that, the tunneling method optimization plan is proposed from the view of these three influence factors. The results show that TM-1 always induces invert uplift, whereas TM-2 mainly brings about invert uplift or sidewall bulging depending on which transverse or vertical linings are dominant in terms of axial force values. For TM-2, the axial force in transverse linings can suppress the development of maximum deformation increment (MDI) value at invert when the axial forces in transverse linings are smaller than those in vertical linings. It is also found that with the further increase of the axial force in transverse linings in TM-2, MDI relocates to the sidewall. Moreover, on the basis of the displacement risk evaluations, an optimization on the temporary lining configurations has been developed by replacing temporary linings with pre-tension anchor cables to reduce the risk of dismantling temporary linings. All the research results can provide some important reference for the similar tunnel engineering in the future.
format Online
Article
Text
id pubmed-10188613
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Nature Publishing Group UK
record_format MEDLINE/PubMed
spelling pubmed-101886132023-05-18 Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration Zhang, Huijian Liu, Kai Cao, Pan Liu, Gongning Sci Rep Article In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this paper, the comprehensive research is conducted on the displacement risk caused by dismantling temporary lining based on two alternative tunneling methods (TM-1 and TM-2). Besides, the following three influence factors are taken into consideration: the axial forces in temporary linings, the thickness of preliminary linings, and the deformation modulus of ground. After that, the tunneling method optimization plan is proposed from the view of these three influence factors. The results show that TM-1 always induces invert uplift, whereas TM-2 mainly brings about invert uplift or sidewall bulging depending on which transverse or vertical linings are dominant in terms of axial force values. For TM-2, the axial force in transverse linings can suppress the development of maximum deformation increment (MDI) value at invert when the axial forces in transverse linings are smaller than those in vertical linings. It is also found that with the further increase of the axial force in transverse linings in TM-2, MDI relocates to the sidewall. Moreover, on the basis of the displacement risk evaluations, an optimization on the temporary lining configurations has been developed by replacing temporary linings with pre-tension anchor cables to reduce the risk of dismantling temporary linings. All the research results can provide some important reference for the similar tunnel engineering in the future. Nature Publishing Group UK 2023-05-16 /pmc/articles/PMC10188613/ /pubmed/37193744 http://dx.doi.org/10.1038/s41598-023-35047-1 Text en © The Author(s) 2023 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) .
spellingShingle Article
Zhang, Huijian
Liu, Kai
Cao, Pan
Liu, Gongning
Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
title Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
title_full Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
title_fullStr Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
title_full_unstemmed Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
title_short Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
title_sort evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10188613/
https://www.ncbi.nlm.nih.gov/pubmed/37193744
http://dx.doi.org/10.1038/s41598-023-35047-1
work_keys_str_mv AT zhanghuijian evaluationondisplacementrisksofdismantlingtemporaryliningintunnelandoptimizationontemporaryliningconfiguration
AT liukai evaluationondisplacementrisksofdismantlingtemporaryliningintunnelandoptimizationontemporaryliningconfiguration
AT caopan evaluationondisplacementrisksofdismantlingtemporaryliningintunnelandoptimizationontemporaryliningconfiguration
AT liugongning evaluationondisplacementrisksofdismantlingtemporaryliningintunnelandoptimizationontemporaryliningconfiguration