Cargando…
Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining configuration
In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this...
Autores principales: | Zhang, Huijian, Liu, Kai, Cao, Pan, Liu, Gongning |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10188613/ https://www.ncbi.nlm.nih.gov/pubmed/37193744 http://dx.doi.org/10.1038/s41598-023-35047-1 |
Ejemplares similares
-
Stability evaluation of rock pillar between twin tunnels using the YAI
por: Zhang, Huijian, et al.
Publicado: (2023) -
This is Temporary
por: St Hill, Cate
Publicado: (2019) -
Temporary Myopic Shift in a Patient with Multiple Parallel-Line Endotheliitis
por: Lee, Jee Hye, et al.
Publicado: (2023) -
Orbit correction in LEP version 13 - temporary 90-degree configuration
por: Marti, Y
Publicado: (1984) -
War, displacement, and the best location for temporary sheltering: a qualitative study
por: Ramazani, Reza, et al.
Publicado: (2022)