Cargando…

Production scheduling of prefabricated components considering delivery methods

To address the processing scheduling problem involving multiple molds, components, and floors, we propose the Genetic Grey Wolf Optimizer (GGA) as a means to optimize the production scheduling of components in a production line. This approach combines the Grey Wolf algorithm with the genetic algorit...

Descripción completa

Detalles Bibliográficos
Autores principales: Wang, Shuqiang, Zhang, Xi
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10497527/
https://www.ncbi.nlm.nih.gov/pubmed/37700018
http://dx.doi.org/10.1038/s41598-023-42374-w