Cargando…
Production scheduling of prefabricated components considering delivery methods
To address the processing scheduling problem involving multiple molds, components, and floors, we propose the Genetic Grey Wolf Optimizer (GGA) as a means to optimize the production scheduling of components in a production line. This approach combines the Grey Wolf algorithm with the genetic algorit...
Autores principales: | Wang, Shuqiang, Zhang, Xi |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10497527/ https://www.ncbi.nlm.nih.gov/pubmed/37700018 http://dx.doi.org/10.1038/s41598-023-42374-w |
Ejemplares similares
-
Prefabricated concrete components combination schemes selection based on comprehensive benefits analysis
por: Wang, Shuqiang, et al.
Publicado: (2023) -
Intelligent Control Method of Hoisting Prefabricated Components Based on Internet-of-Things
por: Zhao, Yuhong, et al.
Publicado: (2021) -
Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application
por: Wang, Jingjing, et al.
Publicado: (2023) -
Microdissected Prefabricated Flap: An Evolution in Flap Prefabrication
por: Taş, Süleyman
Publicado: (2016) -
Technical drawings - construction drawings - general rules for execution of production drawings for prefabricated structural components
por: International Organization for Standardization. Geneva
Publicado: (1990)