Cargando…

Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study

The double sidewall guide pit and centre cross diagram (CRD) methods are often used for the construction of large-section tunnels through water-rich fault fracture zones due to their long construction time and high construction cost. To shorten the construction period and save costs, the top heading...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhu, Ting, Liu, Yuanming
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10517136/
https://www.ncbi.nlm.nih.gov/pubmed/37737477
http://dx.doi.org/10.1038/s41598-023-42458-7