Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study
The double sidewall guide pit and centre cross diagram (CRD) methods are often used for the construction of large-section tunnels through water-rich fault fracture zones due to their long construction time and high construction cost. To shorten the construction period and save costs, the top heading...
Autores principales: | Zhu, Ting, Liu, Yuanming |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10517136/ https://www.ncbi.nlm.nih.gov/pubmed/37737477 http://dx.doi.org/10.1038/s41598-023-42458-7 |
Ejemplares similares
-
Analysis for bearing performance and construction mechanical behavior of supporting structure for the large cross-section tunnel by half bench CD method
por: Zhao, Rui
Publicado: (2021) -
PS tunnel : trial section under construction
por: CERN PhotoLab
Publicado: (1955) -
Stability Analysis and Construction Parameter Optimization of Tunnels in the Fractured Zone of Faults
por: Huang, Banma, et al.
Publicado: (2022) -
Mechanical Behavior of Anchor Bolts for Shallow Super-Large-Span Tunnels in Weak Rock Mass
por: He, Shaohui, et al.
Publicado: (2023) -
Introduction to tunnel construction
por: Chapman, David, et al.
Publicado: (2018)