Cargando…
Optimizing the Long-Term Operating Plan of Railway Marshalling Station for Capacity Utilization Analysis
Not only is the operating plan the basis of organizing marshalling station's operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Fir...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi Publishing Corporation
2014
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4261874/ https://www.ncbi.nlm.nih.gov/pubmed/25525614 http://dx.doi.org/10.1155/2014/251315 |