Cargando…

Optimizing the Long-Term Operating Plan of Railway Marshalling Station for Capacity Utilization Analysis

Not only is the operating plan the basis of organizing marshalling station's operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Fir...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhou, Wenliang, Yang, Xia, Qin, Jin, Deng, Lianbo
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi Publishing Corporation 2014
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4261874/
https://www.ncbi.nlm.nih.gov/pubmed/25525614
http://dx.doi.org/10.1155/2014/251315

Ejemplares similares