Cargando…
Evaluation of Heat Stress in Construction Site of Metro Rail in Chennai
INTRODUCTION: Tunnel boring machine (TBM) is used for constructing a tunnel. Worn out cutting tools have to be changed under difficult working conditions. Temperature is high and the work is strenuous. Work is often carried out under increased atmospheric pressure to ward off water ingress. Workers...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Medknow Publications & Media Pvt Ltd
2018
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6176705/ https://www.ncbi.nlm.nih.gov/pubmed/30319232 http://dx.doi.org/10.4103/ijoem.IJOEM_51_18 |