Cargando…

Incoming Work-In-Progress Prediction in Semiconductor Fabrication Foundry Using Long Short-Term Memory

Preventive maintenance activities require a tool to be offline for long hour in order to perform the prescribed maintenance activities. Although preventive maintenance is crucial to ensure operational reliability and efficiency of the tool, long hour of preventive maintenance activities increases th...

Descripción completa

Detalles Bibliográficos
Autores principales: Tin, Tze Chiang, Chiew, Kang Leng, Phang, Siew Chee, Sze, San Nah, Tan, Pei San
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi 2019
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6334351/
https://www.ncbi.nlm.nih.gov/pubmed/30719036
http://dx.doi.org/10.1155/2019/8729367
Descripción
Sumario:Preventive maintenance activities require a tool to be offline for long hour in order to perform the prescribed maintenance activities. Although preventive maintenance is crucial to ensure operational reliability and efficiency of the tool, long hour of preventive maintenance activities increases the cycle time of the semiconductor fabrication foundry (Fab). Therefore, this activity is usually performed when the incoming Work-in-Progress to the equipment is forecasted to be low. The current statistical forecasting approach has low accuracy because it lacks the ability to capture the time-dependent behavior of the Work-in-Progress. In this paper, we present a forecasting model that utilizes machine learning method to forecast the incoming Work-In-Progress. Specifically, our proposed model uses LSTM to forecast multistep ahead incoming Work-in-Progress prediction to an equipment group. The proposed model's prediction results were compared with the results of the current statistical forecasting method of the Fab. The experimental results demonstrated that the proposed model performed better than the statistical forecasting method in both hit rate and Pearson's correlation coefficient, r.