Cargando…

Experimental Assessment of Time-Limited Operation and Rectification of a Bridge Crane

This paper describes a problem related to a casting bridge crane with a combined load of 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. Due to the specific stress of the structure after its long-term operation, longitudinal fillet welds between the upper flange and t...

Descripción completa

Detalles Bibliográficos
Autores principales: Frankovský, Peter, Delyová, Ingrid, Sivák, Peter, Kurylo, Piotr, Pivarčiová, Elena, Neumann, Vojtech
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7344803/
https://www.ncbi.nlm.nih.gov/pubmed/32545917
http://dx.doi.org/10.3390/ma13122708