Cargando…

The Hernia ‘CAMP’ model: a collaborative action to maximise productivity within the NHS

BACKGROUND: An ever-growing and long surgical waiting list is a challenge within the NHS. Long waiting times can result in complications of the condition with more challenging operations and additional procedures. All of which implies reduced quality of life for patients and increased strain on NHS...

Descripción completa

Detalles Bibliográficos
Autores principales: Koshy, R. M., Ali, M., Fernando, T., Menon, V. S.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Springer Paris 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7395910/
https://www.ncbi.nlm.nih.gov/pubmed/31997030
http://dx.doi.org/10.1007/s10029-020-02121-w