Cargando…
Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach
In the management of intermodal transportation, incentive contract design problem has significant impacts on the benefit of a multimodal transport operator (MTO). In this paper, we analyze a typical water-rail-road (WRR) intermodal transportation that is composed of three serial transportation stage...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2019
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7514643/ https://www.ncbi.nlm.nih.gov/pubmed/33266877 http://dx.doi.org/10.3390/e21020161 |
_version_ | 1783586635615567872 |
---|---|
author | Zhang, Wenying Wang, Xifu Yang, Kai |
author_facet | Zhang, Wenying Wang, Xifu Yang, Kai |
author_sort | Zhang, Wenying |
collection | PubMed |
description | In the management of intermodal transportation, incentive contract design problem has significant impacts on the benefit of a multimodal transport operator (MTO). In this paper, we analyze a typical water-rail-road (WRR) intermodal transportation that is composed of three serial transportation stages: water, rail and road. In particular, the entire transportation process is planned, organized, and funded by an MTO that outsources the transportation task at each stage to independent carriers (subcontracts). Due to the variability of transportation conditions, the travel time of each transportation stage depending on the respective carrier’s effort level is unknown (asymmetric information) and characterized as an uncertain variable via the experts’ estimations. Considering the decentralized decision-making process, we interpret the incentive contract design problem for the WRR intermodal transportation as a Stackelberg game in which the risk-neutral MTO serves as the leader and the risk-averse carriers serve as the followers. Within the framework of uncertainty theory, we formulate an uncertain bi-level programming model for the incentive contract design problem under expectation and entropy decision criteria. Subsequently, we provide the analytical results of the proposed model and analyze the optimal time-based incentive contracts by developing a hybrid solution method which combines a decomposition approach and an iterative algorithm. Finally, we give a simulation example to investigate the impact of asymmetric information on the optimal time-based incentive contracts and to identify the value of information for WRR intermodal transportation. |
format | Online Article Text |
id | pubmed-7514643 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2019 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-75146432020-11-09 Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach Zhang, Wenying Wang, Xifu Yang, Kai Entropy (Basel) Article In the management of intermodal transportation, incentive contract design problem has significant impacts on the benefit of a multimodal transport operator (MTO). In this paper, we analyze a typical water-rail-road (WRR) intermodal transportation that is composed of three serial transportation stages: water, rail and road. In particular, the entire transportation process is planned, organized, and funded by an MTO that outsources the transportation task at each stage to independent carriers (subcontracts). Due to the variability of transportation conditions, the travel time of each transportation stage depending on the respective carrier’s effort level is unknown (asymmetric information) and characterized as an uncertain variable via the experts’ estimations. Considering the decentralized decision-making process, we interpret the incentive contract design problem for the WRR intermodal transportation as a Stackelberg game in which the risk-neutral MTO serves as the leader and the risk-averse carriers serve as the followers. Within the framework of uncertainty theory, we formulate an uncertain bi-level programming model for the incentive contract design problem under expectation and entropy decision criteria. Subsequently, we provide the analytical results of the proposed model and analyze the optimal time-based incentive contracts by developing a hybrid solution method which combines a decomposition approach and an iterative algorithm. Finally, we give a simulation example to investigate the impact of asymmetric information on the optimal time-based incentive contracts and to identify the value of information for WRR intermodal transportation. MDPI 2019-02-09 /pmc/articles/PMC7514643/ /pubmed/33266877 http://dx.doi.org/10.3390/e21020161 Text en © 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Zhang, Wenying Wang, Xifu Yang, Kai Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach |
title | Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach |
title_full | Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach |
title_fullStr | Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach |
title_full_unstemmed | Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach |
title_short | Incentive Contract Design for the Water-Rail-Road Intermodal Transportation with Travel Time Uncertainty: A Stackelberg Game Approach |
title_sort | incentive contract design for the water-rail-road intermodal transportation with travel time uncertainty: a stackelberg game approach |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7514643/ https://www.ncbi.nlm.nih.gov/pubmed/33266877 http://dx.doi.org/10.3390/e21020161 |
work_keys_str_mv | AT zhangwenying incentivecontractdesignforthewaterrailroadintermodaltransportationwithtraveltimeuncertaintyastackelberggameapproach AT wangxifu incentivecontractdesignforthewaterrailroadintermodaltransportationwithtraveltimeuncertaintyastackelberggameapproach AT yangkai incentivecontractdesignforthewaterrailroadintermodaltransportationwithtraveltimeuncertaintyastackelberggameapproach |