Cargando…

Cluster equilibrium scheduling method based on backpressure flow control in railway power supply systems

The purpose of the study is to solve problems, i.e., increasingly significant processing delay of massive monitoring data and imbalanced tasks in the scheduling and monitoring center for a railway network. To tackle these problems, a method by using a smooth weighted round-robin scheduling based on...

Descripción completa

Detalles Bibliográficos
Autores principales: Qu, Zhijian, Liu, Hanxin, Wang, Hanlin, Chen, Xinqiang, Chi, Rui, Wang, Zixiao
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7725313/
https://www.ncbi.nlm.nih.gov/pubmed/33296425
http://dx.doi.org/10.1371/journal.pone.0243543