Cargando…
Failure analysis of primary waste heat boiler tube in ammonia plant
The primary Waste Heat Boiler (WHB) in an ammonia plant experienced cap leaking and the outer tube rupture after ten months since the last repair and replacement (total retubing). The leaking cap and the outer tube materials are low carbon steel SA-204 Gr. B and SA-209 Gr. T1a. The inappropriate ver...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7889993/ https://www.ncbi.nlm.nih.gov/pubmed/33644456 http://dx.doi.org/10.1016/j.heliyon.2021.e06151 |