Cargando…
Failure analysis of primary waste heat boiler tube in ammonia plant
The primary Waste Heat Boiler (WHB) in an ammonia plant experienced cap leaking and the outer tube rupture after ten months since the last repair and replacement (total retubing). The leaking cap and the outer tube materials are low carbon steel SA-204 Gr. B and SA-209 Gr. T1a. The inappropriate ver...
Autores principales: | Ardy, Husaini, Putra, Yudhistira Perdana, Anggoro, Adimas Dwi, Wibowo, Arie |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7889993/ https://www.ncbi.nlm.nih.gov/pubmed/33644456 http://dx.doi.org/10.1016/j.heliyon.2021.e06151 |
Ejemplares similares
-
Failure investigation of boiler tubes
por: Haribhakti, Paresh, et al.
Publicado: (2018) -
Economy in the Generation and Use of Steam: Waste of Heat in the Boiler
Publicado: (1915) -
Theoretical and experimental study of waste-heat-recovery boiler with water injection
por: Shin, Jaehun, et al.
Publicado: (2023) -
Properties of Ceramic Coating on Heating Surface of Waste Incineration Boiler Prepared by Slurry Method
por: Wei, Zengzhi, et al.
Publicado: (2022) -
The nalco guide to boiler failure analysis
por: Port, Robert D.
Publicado: (1991)