Experimental Study of High Performance Synchronous Grouting Materials Prepared with Clay

Shield construction discharges a large amount of soil and muck. The utilization of discharged soil of shield always has high energy consumption and a low utilization rate. Meanwhile, synchronous grouting is a key process for shield tunneling. The current studies show that the synchronous grouting ma...