Cargando…
Sediment and morphological changes along Yangtze River’s 500 km between Datong and Xuliujing before and after Three Gorges Dam commissioning
The impoundment of the Three Gorges Dam on the Yangtze River begins in 2003 and a full pool level is first attained in 2010. This process leads to reciprocal adjustments in flow discharge, sediment transport and morphology downstream of the dam. Based on 26-year recorded hydrologic data 1990–2015 an...
Autores principales: | Xie, Qiancheng, Yang, James, Lundström, T. Staffan |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8249603/ https://www.ncbi.nlm.nih.gov/pubmed/34211024 http://dx.doi.org/10.1038/s41598-021-93004-2 |
Ejemplares similares
-
Detection of the Three Gorges Dam influence on the Changjiang (Yangtze River) submerged delta
por: Dai, Zhijun, et al.
Publicado: (2014) -
Regime shift in fish assemblage structure in the Yangtze River following construction of the Three Gorges Dam
por: Gao, Xin, et al.
Publicado: (2019) -
Riverbed erosion of the final 565 kilometers of the Yangtze River (Changjiang) following construction of the Three Gorges Dam
por: Zheng, Shuwei, et al.
Publicado: (2018) -
Spatial and Temporal Changes of Sand Mining in the Yangtze River Basin since the Establishment of the Three Gorges Dam
por: Ma, Yugai, et al.
Publicado: (2022) -
Three Gorges Dam: the changing trend of snail density in the Yangtze River basin between 1990 and 2019
por: Gong, Yanfeng, et al.
Publicado: (2023)