Cargando…
Integrated assessment of CO(2)-ECBM potential in Jharia Coalfield, India
Coalbed methane (CBM) production is effectively achieved by utilizing two processes, viz. primary and secondary recovery. In this paper, the primary recovery of CBM was studied using the adsorption isotherm while CO(2)-ECBM process for the secondary recovery was simulated with realistic parameters....
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9085830/ https://www.ncbi.nlm.nih.gov/pubmed/35534495 http://dx.doi.org/10.1038/s41598-022-10574-5 |