Cargando…

Research on Multi-Level Scheduling of Mine Water Reuse Based on Improved Whale Optimization Algorithm

Aiming at the problem of the inefficiency of coal mine water reuse, a multi-level scheduling method for mine water reuse based on an improved whale optimization algorithm is proposed. Firstly, the optimization objects of mine water reuse time and reuse cost are used to establish the optimal scheduli...

Descripción completa

Detalles Bibliográficos
Autores principales: Bo, Lei, Li, Zhihan, Liu, Yang, Yue, Yuangan, Zhang, Zihang, Wang, Yiying
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9318344/
https://www.ncbi.nlm.nih.gov/pubmed/35890844
http://dx.doi.org/10.3390/s22145164