Cargando…

Research of Flexible Assembly Job-Shop Batch–Scheduling Problem Based on Improved Artificial Bee Colony

This study examined the flexible assembly job-shop scheduling problem with lot streaming (FAJSP-LS), common in multivariety and small-batch production, such as household electrical appliances. In FAJSP-LS, an assembly stage is appended to the flexible job shop, and jobs in the first stage are proces...

Descripción completa

Detalles Bibliográficos
Autores principales: Li, Xiulin, Lu, Jiansha, Yang, Chenxi, Wang, Jiale
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Frontiers Media S.A. 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9425055/
https://www.ncbi.nlm.nih.gov/pubmed/36051590
http://dx.doi.org/10.3389/fbioe.2022.909548