Cargando…
Evaluation of Void Defects behind Tunnel Lining through GPR forward Simulation
Voids, a common defect in tunnel construction, lead to the deterioration of the lining structure and reduce the safety of tunnels. In this study, ground-penetrating radar (GPR) was used in tunnel lining void detection. Based on the finite difference time domain (FDTD) method, a forward model was est...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9783560/ https://www.ncbi.nlm.nih.gov/pubmed/36560069 http://dx.doi.org/10.3390/s22249702 |