Cargando…
An Improved African Vulture Optimization Algorithm for Dual-Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problems
According to the characteristics of flexible job shop scheduling problems, a dual-resource constrained flexible job shop scheduling problem (DRCFJSP) model with machine and worker constraints is constructed such that the makespan and total delay are minimized. An improved African vulture optimizatio...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9824686/ https://www.ncbi.nlm.nih.gov/pubmed/36616686 http://dx.doi.org/10.3390/s23010090 |